17) What is the minimum amount of cover over pipe allowed for design loads? 1.02 SUBMITTALS A. Your one-stop source for VDOT maps, data and project info. 2016v1.0 Chapter 4 4, 5 PRE CONSTRUCTION ISSUES Prior to construction the pipe delivered to the project should be inspected and verified to be the pipe specified for the project. No additional payment will be made for the repair or replacement of existing concrete damaged, ITEM NO. SECTION 9. Drop Inlet Backfill Frequency Example: Depth of Backfill = 9 feet Depth of Backfill (ft.) x 12 inches /foot = Depth of backfill in inches 1) 9ft. CON 310 Soils and Aggregates (Soils and Compaction) Homework Name:_____ 1) Why is it important for material testing technicians understand how to perform both the nuclear density test and the sandcone test for compaction testing? That list has been provided below: To learn about CHANGES up to 2018, please review the following: If youhave more in-depth questions, contact the Materials Certification Schools team: Email:MaterialsCertification@vdot.virginia.gov, Phone: J. R. Noble 804-731-9457 or Scott Manning 804-229-5118. Milo Wade; 3 years ago ; Views: Transcription. 6) Line the trench with the non woven drainage fabric. Manufacturing and Trades >> VDOT - Certifications. SUBDRAINS AND FOOTING DRAIN COLLECTORS. Structure Earthwork: 02200. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Silts and clays are made of particles that are smaller than which sieve? All materials, Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices, CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. VDOT: Soils and Aggregate Compaction. endstream endobj startxref Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer, DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. All rights reserved. Test pattern is to begin after the first 4 lift above bedding and continue to 1 foot above top of the pipe. Get the free VDOT Soils and Aggregate Compaction Description . 2016v1.0 Chapter 4 10, 11 Place Bedding Stable and uniform bedding must be provided for the pipe and any protruding features of its joints and/or fittings. The moisture content at which a soil can be compacted to its maximum dry density with the least amount of comparative effort is called the optimum moisture content. For positive projection embankment installations, the embankment material should be placed and compacted to a minimum of one foot above the pipe and the trench excavated into the embankment. Larry Ritchie, SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction), Table 4.9 Storm Drain Inlet Protetion Applicable for, INSTALLATION GUIDE. = 12 lifts 3) 12 lifts 1 lift (skip first lift) = 11 lifts 4) 11lifts 4 (test every fourth compacted lift) = 2.75, round up to 3 tests in bottom 4 ft. of backfill Top 5 ft. of backfill x 3 lifts/ft. Identify typical construction, 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Soil compaction occurs when soil particles are pressed together, reducing pore space between them (Figure 1). Geotechnical Design Parameters for Retaining Walls, Sound Barrier Walls and Non-Critical Slopes. Request PDF | Advanced fatigue and rutting characterisation of Polish asphalt mixtures based on the VECD model and viscoplastic shift model | The advanced asphalt mixture performance-related . 0 Prepared by Risi Stone Systems Used by permission. For larger diameter pipe, >30 inches, embedment materials should be worked under the haunches by hand. Provide, SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION, Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections, CHAPTER 9 SEWER / STORM DRAIN / IRRIGATION LINES SECTION 9.01 GENERAL This section covers the requirements for piping materials and installation of Lehi City sewer, storm drainage and irrigation collection. bored but can't be bothered to do anything. 6.2 PIPE PVC gravity sewer pipe and fittings, SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General 1 1.01 Work Included 1 1.02 Related Requirements 1 1.03 Reference Standards 1 1.04 Quality Assurance 1 1.05 Measurement And. This happens because large pores more effectively move water downward through . We encourage you to plan accordingly and register soon, to allow ample time for your staff to meet all the requirements needed for recertification. waste aggregate )-4CWP( 4% ceramic waste pow der) represents a 10% aggregate substitution with ceramic waste. 4) What is the maximum size a rock to be placed within 12 inches of a pipe? 5.01 Design, PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS, SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO), TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe. 1 (do not test 1st lift) = 2) = 14 tests required per 300 (Answer) Pipe Testing Frequency Example 2: Pipe Diameter = 36 in. 15) What end of the pipe system do you start installation? General: Submit the following in accordance with The General Conditions. Soils will not need to obtain a VDOT Soils and Aggregate Compaction Certification. Some links may require the Adobe Reader. True. Figure 4.3: Minimum Cover to Allow Construction Traffic over Pipe 2016v1.0 Chapter 4 3, 4 The following tables give VDOT specifications for maximum height of cover for some types of pipe. The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. VDOT Materials Certification Schools. Locate Utilities Prior to excavating the trench area, all utilities should be located by a qualified contractor. stream The fill above the top of the regular backfill shall be installed and completed as specified for embankment construction. Furnish and install culvert pipe, entrance pipe, and storm sewer pipe. 6) The tolerance on the optimum moisture content at which aggregate must be compacted is 2 percentage points. This section includes all labor, materials, equipment, and incidentals required and installation of Polyvinyl Chloride, STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. 1) Metal pipe gauge: Examples 12, 14, 16 2) Metal pipe corrugation dimensions: Examples 2 2/3 x ; 3 x 1 3) Concrete pipe strength: Examples Class III, IV or V 4) ph and Resistivity needs to be known by designer 2016v1.0 Chapter 4 5, 6 5) Maximum height of cover: Maximum height for each type of pipe must be given Compare information from drainage summary with maximum cover chart for pipe to be used Check standards for minimum height of cover Measuring Metal Pipe Corrugation example 3 x 2 3 2 Examples of concrete pipe stamp: They typically include manufactured date, diameter, pipe type, class, place of manufacturing. container, large spoon, and 1.1 lbs. Materials. Confined O Ring: The first rubber gasket joint design established by the industry. hb```f````2X@( [ $ Road and Bridge Standards. As a reminder, all certification courses are available either online or through a self-study option at the respective community colleges. x]mo8^AXIQ/Ivzvw8NjL{bs(JIeYy!E'b~t_,NO?Ob]/yI(24z\|D/__8yC2|A5ID Q^G{q}I4w4/.jYYL%o#'? SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials, To make this website work, we log user data and share it with processors. How far should the hammer fall?, What are the moisture and density content corresponding to the peak of the curve . . CULVERTS AND BRIDGES 7-5 7.7. Importance to Maintenance & Water Quality. - 2000, If you believe that this page should be taken down, please follow our DMCA take down process, Something went wrong! 1. Upstream or down stream? The middle of the bedding, should be loosely placed and not exceed 8 inches. Soils & Aggregate CCWA $ 350.00 $ 250.00 Handson proficiency will be scheduled upon . If the inspection is conducted manually, the person performing the inspection may use a standard video camera or a digital camera to document any observed deficiencies. 5) Open only as much trench as can be safely maintained by available equipment. 5) Install pipe to grade 6) Compact structural bedding outside the middle third of the pipe 7) Place structural bedding in lifts 8) Complete structural backfill operation by working from side to side of the pipe, differential not to exceed 24 or 1/3 size of pipe. ]6)[mesog)!df{9IsRC cS /%INL Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY, SECTION 33 31 00.11 GRAVITY SANITARY SEWERS, DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL, SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS, San Antonio Water System Standard Specifications for Construction ITEM NO. PMO Instructional and Informational Memoranda. The mandrel shall be pulled through the pipe or culvert by hand with a rope or cable. In this research work three methods of handling rock sized aggregates which include compacting the whole sample (method . The following drawing provides typical VDOT standards for pipe bedding and backfill. 1 4 INSTALLATION OF PIPE AND TESTING OF PIPE BACKFILL LEARNING OUTCOMES Understand basic pipe and soil concepts and how they relate to preconstruction issues Understand fundamental trench concepts and pipe installation procedures Understand . 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by. 4 to 3/4 in. The goal shall be to collect, C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. Single Offset: This joint first appeared in the early 1990 s. This style of spigot is much easier to manufacture. SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS, Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. CATCH BASINS 7-3 7.4. This prevents disruption of the backfill envelope when removing the shoring or trench box. Explore Foundation A stable foundation must be provided to ensure proper line and grade is maintained. When backfill is below spring line of pipe, compact next to pipe first and work towards the trench wall. 6) Where can the typical underdrain drawings be found? %PDF-1.7 Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent, Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Submit, SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. VDOTSoilsandAggregateCompaction 6 FIELDMOISTUREANDDENSITYTESTING WITHTHENUCLEARGAUGE LEARNINGOUTCOMES . 4 in.) Download Free PDF. %PDF-1.5 % STORM SEWERS 402.01. It is designed to prove an individuals' understanding of nuclear density testing, one-point proctor and "Speedy" moisture tests. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown, 402.02 Section 402. This type joint gasket combination provides a leak resistant joint. 2e\o ngV10J6q`pp)|Hpm3@BF > endobj 298 0 obj <> endobj 299 0 obj <>stream Currently VDOT certified or Mid Atlantic Regional Technician Program (MARTCP) in the following disciplines: - Expected VDOT Certifications Soil and Aggregate Field Compaction Asphalt Field Hydraulic Cement Concrete Field Pavement Marking Flagger Certification Certification & Issuing Agency Soil and Aggregate Compaction - VDOT or NICET LEVEL II* It is generally easier to install due to less stringent lubrication requirements for the gasket. Contractor shall be responsible for all utility fees. 282 0 obj <> endobj Please click on the course title to see the full course description. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with, Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. Alternative Project Delivery | Construction| Cost Estimation Office| Local Assistance |Location and Design | Maintenance |Materials |Office of Land Use | Operations | Project Management Office | Right of Way/Utilities | Structure and Bridge |Traffic Engineering | Transportation and Mobility Planning. Fill Vdot Soils And Aggregate Compaction, Edit online. Web Policy / Privacy Statement / WAI Compliance / Email Safety / Site Map, APD Instructional and Informational Memoranda, Minimum Requirements for Quality Assurance and Quality Control on Design Build and P3 Projects, AASHTOWare Project Preconstruction (AWP-P) Manual, Construction Instructional and Informational Memoranda, Instructional and Informational Memoranda, Alternative Intersection Informational Design Guides, LD Instructional and Informational Memoranda, PMO Instructional and Informational Memoranda, Pollution Prevention Field Guide for Construction Activities, Roadside Development Report Excel spreadsheet tool, Nutrient Management Plan for Construction Projects, Nutrient Management Plan for Roadside Management, VDOT BMP Maintenance Manual Appendix C - Plant Palette Tables, Materials Certification School Information, Guide to the Traffic Impact Analysis Regulations, Land Development Inspection Documentation Best Practices Manual, OD Instructional and Informational Memoranda, Guide Manual for Causes and Repair of Cracks in Bridge Deck, Traffic Calming Guide for Neighborhood Streets, Manual on Uniform Traffic Control Devices (MUTCD), TED Instructional and Informational Memoranda, VDOT Traffic Operations and Safety Analysis Manual (TOSAM), Instructional and informational memoranda, Manual for the Procurement and Management of Professional Services. 3) What are the testing requirements for backfilling around pipe? This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including, BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. Contractor shall ensure that all permits are obtained prior to any construction. SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies, SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard, LS 2540 SEWER LATERALS AND INSPECTION TEES A. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. CHAPTER 4 STUDY QUESTIONS 2) True or False. Backfill material shall be knifed into the area along the bottom edge of the pipe. 71 terms. If you have questions, please provide us with the course title and number when e-mailing or calling. SECTION 33 41 00 REINFORCED CONCRETE PIPE. San Antonio Water System Standard Specifications for Construction ITEM NO. Some links may require the Adobe Reader. Concrete Field 1. B. For flexible pipe this begins 12 over top of pipe for smaller pipe and 18 for pipe 54 and larger. Soiltight joints provide protection against infiltration of backfill material containing high percentage of coarse grain soils, and are influenced by the size of the opening (maximum dimension normal to the direction that the soil may infiltrate) and the length of the channel (length of the path along which the soil may infiltrate). Section Includes: Furnishing and installing nonreinforced concrete sewer pipe. Download. 1.01 Testing - General, June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL, HDPE PRODUCTS QUALITY, PERFORMANCE AND ECONOMY COMBINED, Chapter 3 CULVERTS. SOILS AND AGGREGATE COMPACTION FIELD CERTIFICATION STUDY GUIDE 2016 Prepared By: The Virginia Department of Transportation (VDOT), Materials Division Note: The information included in this manual is generally compatible with current VDOT Road and Bridge Specifications; however, it should not be considered or used as a primary reference for VDOT Block and gravel inlet Protection (Temporary) 6.52.1. 200 sieve. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall, Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm, SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. All new construction involves a study and analysis of the on-site soils. 'i$%qyI4[hmrZF 4Obz:;q"ZIE0~^I!)s6E@DCVj'1ey(IL#"`L.>G'@>{7&l0. RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies. American Water Works Association This course is based on ASTM D6938-17a1 Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth). 11 terms. This course includes downloadable resources including a procedural outline and a pdf of the standard, instructional video content, interactive knowledge checks, and a self . endstream endobj startxref STORM SEWERS. 7-1 7.2. These guidelines are applicable to the locating, marking, SECTION 5 - STORM DRAINAGE 5.01 Design Storm drainage facilities shall be designed in accordance with the goals and guidelines set forth in the Unified Development Ordinance. For information on the VECAT program, contact Caroline Fahed, 804-288-3169. Cleaning, Inspecting, and Testing Sanitary Sewers B. True or false: A soil that contains a high percentage of fines is more affected by water that one with a low percentage of fines. endobj Screen the sample over a 3/4-inch sieve and replace the aggregate retained with an equal weight of No. True or false: Open graded aggregates are used in pavement to give the structure more strength. VDOT Soils and Aggregate Compaction 2016v1.0 Chapter 1 | 1 Topics include permits and fees, trench widths, pipe laying, bedding, initial, SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Participated in traffic . This website includes hyperlinks to sites neither controlled nor sponsored by VDOT or the Commonwealth of Virginia. The contractor shall be responsible for repairing any damages, Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the, SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing, SECTION 200: STORM SEWER CONSTRUCTION STANDARDS Page No. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. VECAT,through Germanna Community College (GCC), is hosting the following courses, which are now available either online or in a face to face format: For more information on courses and registration click here or contact Judith Calvert, 540-937-6757. suzanna_gevorgyan. Cracks shall be digitally scanned to allow for accurate measurement. hV[oH+hz3HJ 16) In the case of UD 7, as asphalt concrete cap is used to complete the backfilling and provide the final surface that is even with the shoulder. VDOT Soils and Aggregate Compaction: Chapter 2, VDOT Soils and Aggregate Compaction: Chapter 3, VDOT Soils and Aggregate Compaction: Chapter 4, VDOT Soils and Aggregate Compaction: Chapter 5, VDOT Soils and Aggregate Compaction: Chapter 8, VDOT Soils and Aggregate Compaction: Chapter 6. Weigh clean dry container and record weight. 155 0 obj <>stream Trenching, Backfilling and Compacting: 02223, DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H, City of West Linn Public Works Standard Construction Specifications. What is compaction? Trench widths may be varied, based on the competency of the in situ soil, backfill materials, compaction levels and loads. Community College Workforce Alliance | The Mission of CCWA is to meet . Unsuitable or unstable foundations may be undercut and replaced with a suitable bedding material, placed in 6 lifts. Inspect how the pipe is being stored on site to ensure no damage is being done to the pipe prior to installation. 11) Pipe openings in precast drainage structures shall not exceed the outside cross sectional dimensions of the pipe by more than how much? Lane provides the complete product line to meet all your HDPE drainage needs -, Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. VDOT: Soils and Aggregate Compaction. Description 200-2 201 GENERAL 200-2 201.1 SPECIFICATIONS 200-2 201.2 CONNECTION TO EXISTING FACILITIES 200-3 202 MATERIALS 200-3 202.1 PIPES 200-4, VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS BY JOHN FLECKENSTEIN PIPELINE AND DRAINAGE CONSULTANTS INTRODUCTION History Of Post, 601.1 601.2(a) SECTION 600 INCIDENTAL CONSTRUCTION SECTION 601 PIPE CULVERTS 601.1 DESCRIPTION This work is construction or reconstruction, inspection, and cleaning of pipe culverts; including subsurface, Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts, STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. 2016v1.0 Chapter 4 11, 12 Types of Joints for Concrete Pipe Tongue & Groove: A bell & spigot type joint with straight walls (flush bell). Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. In a flexible pipe this zone must protect the pipe from distortions due to loading extend to 12 above pipe. SECTION 7- STORM SEWER 7.1. Suggested participants would include contractor and supplier quality control personnel, consultants, testing firms and agency . Repair of service laterals located, Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for, SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete, REINFORCED CONCRETE PIPE PRE INSTALLATION INSPECTION & REPAIR MANUAL Kentucky Transportation Cabinet Kentucky Department of Highways Division of Materials 1227 Wilkinson Boulevard Frankfort, KY 40601 (502), Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. (500 grams) of soil. Additionally, a copy shall be furnished to local VDOT Asset Management personnel to document the pipe/culvert condition at that point in time. General: Submit the following in accordance with The General Conditions. 7) Install the longitudinal perforated pipe at the bottom of the trench without bedding material. hb```f``2f`@( Post installation inspections shall be conducted no sooner than 30 days after completion of installation and placement of final cover (except for pavement structure). Proper installation is essential to pavement performance as it increases bearing capacity, increases service life and lowers maintenance costs. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and, 715.01 430 volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension. Care must be exercised to ensure placement and compaction of the embedment material in the haunches. Find the right form for you and fill it out: VisitingProfessorofLaw,StanfordLawSchool(W No results. 4 0 obj What classification systems does VDOT use to classify soils? 18) What is the minimum amount of cover over pipe to prevent damage from construction loads? Conditions of Use Type of Inlet Protection, INSTALLATION GUIDE americanwick.com 800.242.WICK (9425) American Wick Drain SITEDRAIN prefabricated drainage products may be installed in a variety of civil construction applications including: retaining. 200 sieve. hYoF#4rPzL@]Gb)3d@pa@sc/IK^0@Qq. There is still an opportunity to test on the last day of class; however there is . A drained pavement structure has a higher bearing capacity that can effectively support traffic loadings, and lead to long lasting pavement at the least maintenance cost. A copy of the Storm Sewer/Culvert Inspection Report (inspection report)including any video tape/digital Video Recording (DVD)/digital photographs shall be provided to the VDOT Inspector within two business days of the completion of the inspection and made part of the project records. 0 Portion of Section 2102 . SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13), Stormwater/Wetland Pond Construction Inspection Checklist. SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Table of Contents 1. A compacted soil has a reduced rate of both water infiltration and drainage. The trench s dimensions and location are typically 1 foot wide and 2 to 4 inches below the subgrade and adjacent to the pavement edge. The loosely placed center section of the bedding allows the pipe to seat itself and helps minimize point loads.